MicroNex carried out an onsite refurbishment of an existing 8-zone impressed current cathodic protection control system installed at Grain Berth, Port of Brisbane.


The system was installed in two cabinets distributed along the wharf structure. The existing electrical cabinets were utilised to reduce unnecessary costs associated with removing, re-installing, and re-wiring new cabinets.


The new retrofit MicroNex system was equipped with cloud based remote monitoring functionality which displays live and historical current and voltage data for each zone/circuit.


The whole upgrade was carried out over just 2 days.